Company News

20200820 4

Temporary or Permanent Laboratory Solutons

Temporary or Permanent Laboratory Solutons a true cost, time, and space-friendly solution that provides an outlet for deploying laboratory equipment. Our Mobile laboratories can be used as portable or stationary, temporary or permanent, standalone or additional laboratory space. Having a mobile lab can make testing and analyzing more convenient and quicker for some facilities. The …

Temporary or Permanent Laboratory Solutons Read More »

extend Compounding center to Additional Lab Space

Compounding center to Additional Lab Space

One of the benefits of extending the Compounding center to Additional Lab Space is the flexibility and ease of change of the equipment and use cases of your cleanroom. Our MCCs are designed and built to meet our client’s current needs. However, it is important to add that the design and setup can be changed …

Compounding center to Additional Lab Space Read More »

anteroom

Anteroom Configuration in Mobile Cleanroom

Under the USP 800, an anteroom is defined as “An ISO Class 7 or cleaner room” where personnel hand hygiene, garbing procedures, and other activities that generate high particulate levels are performed. The ante-room is the transition room between the unclassified area of the facility and the buffer room. USP 800 requires ante-rooms to produce …

Anteroom Configuration in Mobile Cleanroom Read More »

cleanroom

The Most Efficient Way of Building and Installing a New Cleanroom

Our Mobile Compounding Cleanrooms provide a quick and easy solution to get a complete clean room suite from design to cleanroom installation, built, installed, and commissioned. cleanroom installation: The whole process from design to final delivery and install is a reasonably pain-free process. Our protocol puts all the design and engineering work out of the …

The Most Efficient Way of Building and Installing a New Cleanroom Read More »

Developing an effective compounding strategy

Developing an effective compounding strategy

Developing an effective compounding strategy is critical to ensuring patients have access to properly compounded medications, but because each organization’s needs differ, a one-size-fits-all solution cannot be applied to every hospital. A careful evaluation of the institution’s requirements, the available infrastructure for compounding medications in-house, and any registered 503B compounding facilities in the vicinity with …

Developing an effective compounding strategy Read More »

Reducing risks of exposure to HDs

Reducing risks of exposure to HDs

Although most pharmacy personnel will say that the highest risk of exposure to hazardous drugs is during the compounding process, we feel that there is an even greater risk of exposure to hazardous materials during shipping and receiving. Under the current regulations as well as the upcoming USP <800> the hazardous materials are usually ordered …

Reducing risks of exposure to HDs Read More »

How to get a clean-room designed

How to get a clean-room designed, built and certified in less than 5 months

In case you missed the presentation we did a few days ago on “How to get a mobile, economical “Plug and Play” clean-room for permanent or temporary installations designed, built and certified in less than 5 months”, we now have the recordings available for on-demand review. In this presentation, we review the design/build process for our …

How to get a clean-room designed, built and certified in less than 5 months Read More »

mobile cleanroom

How to get a mobile, economical “Plug and Play” clean-room for permanent or temporary installations designed, built and certified in less than 5 months

We’re starting 2021 with a lot of value with a great FREE Webinar. The presentation will take place on Thursday, January 7th, 2021 at 10 am CST. The goal of this webinar is to show you how you can get a mobile “Plug and Play” cleanroom as a permanent or temporary solution from design to build and …

How to get a mobile, economical “Plug and Play” clean-room for permanent or temporary installations designed, built and certified in less than 5 months Read More »