AE

Don’t Stop Production for Cleanroom Renovation

When renovating a cleanroom, or creating one from non-cleanroom space, understanding the details — of the site, building, planned research, and equipment — is essential. Cleanrooms are like race cars. When properly designed and built, they are highly efficient performance machines. When poorly designed and built, they operate poorly and are unreliable.
The cost of cleanroom varies dramatically based on size, application, and compliance requirements. Generally, cleaner spaces require more air changes per hour (ACH).
Higher volumes of air require expanded HVAC and design considerations, thus expanding cost.
But the most comprehensive impact on your cleanroom costs are related to the time needed for the construction to be completed.
Usually it takes the contractors between 3 weeks and 3 months to complete all the HVAC, flooring and wall installations. At this time your facility either locks up the clean areas and cease clean production, or your personnel is forced to work out from a third party facility you have to hire.
The solution to these bumps that are going to leave a huge dent on your budget is the Mobile Compounding Cleanroom.

Our mobile cleanroom modules are built to meet your specific ISO classification, pressure and venting requirements. They are delivered factory tested and fully furnished. Site prep requirements are minimal. Delivery, installation, startup and certification can all occur in just a few days. HVAC is included. These modules are made for the long haul and provide exceptional durability and mobility.

They are the perfect solution for facilities with limited space, undergoing renovations, or as an economical permanent installation.
Pre-approved, configurations customized to your specification are available for sale or lease!

Call us with your concept and we can quickly supply a 3D model and specification for your implementation.

800-418-9289

Leave a Comment

Your email address will not be published. Required fields are marked *